Table of Contents
< All Topics
Print

Equipment Shelf Operation Guide (1U Equipment)

Problem Description

*Equipment placement instructions (1U device)*

solution

Step One: Install the floating nuts. Use the ear piece to compare the position of the floating nuts on the square hole bar of Rack (rack), and mark it with a marker. At the same time, use the hanging ear to compare the position of the hanging ear Install the floating nuts, and mark it with a marker so that both ends are on the same horizontal line as shown in the following figure:

Step Two: Install ear pieces (if the ear pieces are already locked when the chassis is delivered, you can Ignore this step) Install the left and right ear pieces that Install with the chassis on the chassis, as shown in the following figure:

Step Three: Install the chassis, place the device on the mounting ears, adjust the position, and use 4 mounting nails to fix the left and right ears on the square hole bar, as shown in the following figure:

Original Link

https://support.sangfor.com.cn/cases/list?product_id=156&type=1&category_id=27540&isOpen=true