Equipment Shelf Operation Guide (2U Equipment)

Problem Description

Equipment Shelf Operation Guide (2U Equipment)

solution

Step One: Install the floating nuts. Use the ear piece to compare the position of the floating nuts on the square hole bar of Rack (rack) and mark it with a marker. Use the mounting ears to compare the position of the mounting ears to Install the floating nuts and mark it with a marker as shown in the following figure:

Step Two: Install ear pieces (if the ear pieces are already locked when the chassis is delivered, you can Ignore this step) Install the left and right ear pieces that Install with the chassis on the chassis, as shown in the following figure:

Step Three: Install the left and right rear mounting ears. Use 4 mounting nails to install the left and right rear mounting ears on the left and right square hole bar columns at the rear of Rack, as shown in the following figure:

Step 4: Install the chassis, place the device on the mounting ears, adjust the position, and use 4 mounting nails to fix the left and right ears on the square hole bar, as shown in the following figure:


**Step Five:**Finally, use the M4x8 screws in the accessory box to fix the chassis AND the left and right rear mounting ears; Count screws is 2~3pcs on each side.

Step Six: Install ground wire